Ir al contenido principal

RoboCons | Cooperative Robotics for Construction – Horizon Europe Project

Measurable Outcomes

Expected Project Impact

A concrete mapping of specific project objectives, high-fidelity KPIs (Key Performance Indicators), and expected structural outcomes on active pilot sites.

-25%
CO₂ Footprint Reduction
Due to circular recycled materials integration (P4) and logistics path routing optimization.
-50%
Site Workplace Incidents
Safety warnings projected via AR overlays (P2) and fatigue monitors reporting to the DCP.
+35%
Assembly & Placement Efficiency
Uninterrupted robot-assisted framing and continuous physical marking logs (P1, P5).
-70%
Lifting Strain Offloading
Active force assistance on lower-back compression via cybernetic wearable systems (P3).
Deliverables Directory

Specific Project Objectives

S01 Enhance Site Efficiency & Sustainability
  • Full integration of high-fidelity simulated and augmented datasets into the Digital Twin core.
  • Validation of dynamic scheduling and collision-avoidance algorithms against global construction schedules.
S02 Empower Mixed Workforce & Enhance Autonomy
  • Deployment of two advanced control loops for resilient, self-correcting robot agent navigation.
  • Delivery of a robust framework managing parameters for 3D printing of custom structural panels.
S03 Demonstrate Integrated Multi-Robot Solutions
  • Successful aggregation of testing data across 5 distinct operational prototypes.
S04 Rigorous Feasibility & Safety Validation
  • Complete operational validation data generated from official Use Cases.
  • Deployment and optimization of 5+ specialized control algorithms in hazardous construction zones.
  • Successful full-scale testing of the unified prototype fleet in 7 rigorous real-world construction scenarios.
S05 Social Acceptance & Life-Cycle Assessment
  • Detailed sustainability and ergonomic stress assessments completed for all 3 primary Use Cases.
  • Formulating comprehensive Life Cycle models analyzing environment, cost, and social indicators of robotics.
S06 Multi-Stakeholder Co-Creation & Policy Synergy
  • 6 multi-lateral workshops (2 per Use Case) actively involving 50+ tier-1 industry stakeholders.
  • Over 10 participations in prime EU-level robotics, automation, and sustainable construction conferences.
  • Publication of a co-created State of the Art White Paper on mixed-crew site orchestration.
S07 Promote Deployment & Industry Adoption
  • Communication, Dissemination, and Exploitation Plan (CDR&E Plan).
  • 4 hands-on industry demonstration workshops hosted on validation sites.
  • Drafting of the final RoboCons Strategic Roadmap for automated modular building projects.
  • Formal collaboration channels established with Building4People (B4P) partnership.